A New Optimization Algorithm for Checking and Sorting Project Schedules
Qinhuangdao Haisan Construction and Project-developing Co. Ltd., No. 301wenhua road, haihang district Qinhuangdao, 066000, P.R. China.
ABSTRACT
The overall project schedule is the basement of construction project. Any problem in it will cause huge economic loses, and it must be checked before being implemented. This paper introduces real value into DSM (design structure matrix), proposes a new checking and sorting method, and designs detailed processes and rules. Additionally the effectiveness of the method is proved through applying it to an example.