The Open Automation and Control Systems Journal
2014, 6 : 1875-1882Published online 2014 December 31. DOI: 10.2174/1874444301406011875
Publisher ID: TOAUTOCJ-6-1875
Process Capability Optimization in Multistage Manufacturing Processes Based on the Cost-Utility Ratio
Business school, Zhengzhou University, Zhengzhou 450001, P.R. China.
ABSTRACT
To solve the problem that process capability optimization in multistage manufacturing processes has not been studied so much. Firstly, a multistage manufacturing process quality variation model is built to analyze the impaction of each stage quality on process capability. Then, a multistage manufacturing process capability analysis method with “Costutility ratio” is proposed to prioritize process capability optimization efforts. At last, a two stage matching process is taken as an example to demonstrate it. The results show that this method ascertains the priorities and process capability optimization degree well.