The Open Mechanical Engineering Journal
2016, 10 : 203-203Published online 2016 December 30. DOI: 10.2174/1874155X01610010203
Publisher ID: TOMEJ-10-203
RETRACTION
Retraction Notice: Mechanical Analysis of Stayed Bridge
1
School of Civil Engineering, Shijiazhuang Tiedao University, 17 Northeast, Second Inner Ring , Shijiazhuang, Hebei,
050043, China
2 Key Laboratory of Roads and Railway Engineering Safety Control of Ministry of Education, Shijiazhuang Tiedao University, Hebei, 050043, China
3 Shijiazhuang Tiecheng Bridge Engineering Testing Co., Ltd., USA
* Address correspondence to this author at the School of Civil Engineering, Shijiazhuang Tiedao University, 17 Northeast, Second Inner Ring, Shijiazhuang, Hebei, 050043, China; E-mail: 46773040@qq.com
2 Key Laboratory of Roads and Railway Engineering Safety Control of Ministry of Education, Shijiazhuang Tiedao University, Hebei, 050043, China
3 Shijiazhuang Tiecheng Bridge Engineering Testing Co., Ltd., USA
* Address correspondence to this author at the School of Civil Engineering, Shijiazhuang Tiedao University, 17 Northeast, Second Inner Ring, Shijiazhuang, Hebei, 050043, China; E-mail: 46773040@qq.com